WisDOT's Design-Build Program is a collaborative contracting process that brings the engineering and construction industries together at the outset of a highway improvement project. Traditionally in Wisconsin, these processes have always been separated, where a designer plans the project and a construction company will then execute on those plans.
WIS 125 6526-00-71 (March 4, 2022)
- I-41 – Bluemound Dr., OUTAGAMIE, NORTHEAST
- Removal of a multi-cell box culvert and replacement with a slab span structure on College Avenue in Appleton
- Best Value Scoring Results
- Proposals received: August 19, 2022
- Results posted: September 9, 2022
- The Highest Adjusted Score is the Best Value Proposal and the project will be awarded to the associated design-builder.
Design-Builder | Technical Proposal Score | Cost Proposal Amount |
Amount Exceeding Lowest Proposal |
Percent Exceeding Lowest Cost Proposal | Price Score | Adjusted Score |
Pheifer Bros | 30.51 | $3,806,945.86 | - | N/A | 60 | 90.61 |
KNA | 31.8 | $5,247,705.00 | $1,440,759.14 | 37.85% | 37.29 | 68.47 |
WIS 130 5770-01-02/72 (February 4, 2022)
- WIS 23 – Lone Rock, Wisconsin River Crossing, RICHLAND, SOUTHWEST
- Construction/replacement of 3 existing bridges across the Wisconsin River with 2 new bridges
- Best Value Score Results (June 3, 2022)
- Proposals received: May 12, 2022
- Results posted: June 3, 2022
- The Highest Adjusted Score is the Best Value Proposal and the project will be awarded to the associated design-builder.
Design-Builder | Technical Proposal Score | Cost Proposal Amount |
Amount Exceeding Lowest Cost Proposal | Percent Exceeding Lowest Cost Proposal |
Price Score |
Adjusted Score |
Kramer North America | 31.92 | $36,937,137 | N/A | N/A | 60 | 91.92 |
Ames Construction | 27.3 | $46,226,000 | $9,288,863 | 25.1% | 44.91 | 72.21 |
US 45 1600-15-00/70 (October 4, 2021)
- County C – Gollnow Rd, WAUPACA/SHAWANO, NORTH CENTRAL
- Construction/replacement of 8 miles of pavement on US 45 west of Clintonville