Location
WIS 32, Whitefish Lake Inlet (Julia Creek), Three Lakes, Oneida County
Project Overview
The purpose of this project is to address the existing culvert in poor condition. This culvert is showing signs of distress with steel pipe corrosion, concrete endwall spalling and slope erosion.
The project's proposed improvements include replacing the existing culvert and reconstructing the section roadway over and approaching the culvert.
Traffic Impacts
The roadway is proposed to be closed during construction. The proposed detour route is US 45 to US 8 to WIS 55.
Public Involvement
A public involvement period was held. The following documents were shared:
Real Estate
Currently no real estate acquisition is anticipated.
Project Schedule
- Local Officials Meeting: April 20, 2023
- Public Involvement: May 8 to May 28, 2023
- Complete Project Design: November 2024
- Construction: Summer 2025