I-94 Corridor Study - History

The following studies document needs within the I-94 corridor:

  • 2005 - Standards evaluation and location study: WIS 35 to WIS 65
  • 2007 - Value engineering study: WIS 35 to County BB
  • 2009 - Standards evaluation and location study: WIS 65 to County BB
  • 2011 - Statewide operational assessment: Hudson to Milwaukee
  • 2013 - WIS 65 interchange: Mainline constructed to allow future 3rd lane
  • ​2013 - Pavement repair and interchange study: WIS 35 to US 12
  • 2014 - Expansion study: US 12 to WIS 65
  • 2017 - WIS 35 to US 12: Construct third​​​ westbound lane