Location
The project is located on the County M (Main Street) Bridge over US 53 in the Chippewa County village of New Auburn.
Overview
Built in 1972, the structure is in need of rehabilitation. The Wisconsin Department of Transportation proposes to:
- Overlay the bridge deck with concrete.
- Replace the bridge joints and bearings.
- Make concrete surface repairs on the structure.
- Replace damaged railing at spot locations.
- Place asphalt on the roadway approaches on both side of the bridge.
- Evaluate and upgrade guardrail on US 53 at the bridge.
Traffic Impacts
During construction, County M will remain open, but traffic will be shifted to one side and then the other.
Schedule
Construction currently is scheduled for 2027.
Project Documents
Contacts
Bill Biesmann
WisDOT Northwest Region Consultant Project Manager
(608) 663-1218, ext. 286
bbiesmann@klengineering.com
Nicole Passuello
WisDOT Northwest Region Project Supervisor
(715) 833-5572
nicole.passuello@dot.wi.gov
Christena T. O’Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov
Wisconsin Department of Transportation
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285
nwr.dtsd@dot.wi.gov