Location
Both culverts are east of Medford and carry unnamed tributaries of the Little Black River under WIS 64. The first is 1,560 feet east of Crane Drive in the town of Medford, and the second is 2,650 feet east of Bizer Drive in the town of Browning, all in Taylor County.
Overview
The town of Browning structure was placed in 1922, and the town of Medford structure was placed in 1938. Both are showing signs of deteriorating and reaching the ends of their service lives. The Wisconsin Department of Transportation is proposing to:
Schedule
Construction currently is scheduled for 2025.
Traffic Impacts
WIS 64 would be closed to through traffic and detoured during construction.
Traffic would be detoured via WIS 97, WIS 29, WIS 13 and WIS 64.
Access will be maintained to property owners on either side of the bridge.
Contacts
Jeff Olson
WisDOT Northwest Region Project Supervisor
(715) 395-3032
jeffrey.olson@dot.wi.gov
Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 828-9471
christena.obrien@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285
nwr.dtsd@dot.wi.gov