The project along WIS 64 begins approximately 550 feet west of the intersection of County O in the town of Sheridan and ends approximately 165 feet west of the north junction of County W in the town of Wilson, all in Dunn County. The total project length is 12.57 miles.
Overview
The twin culvert structure over Otter Creek and the bridge over the Hay River are deteriorating. To address these, the Wisconsin Department of Transportation is proposing:
- Rehabilitating the Hay River Bridge by overlaying the deck with concrete, replacing the joints, updating the parapet end geometry and providing substructure concrete surface repair.
- Replacing the Otter Creek twin culvert structure with a new concrete twin box culvert.
- Cleaning, repairing, lining or replacing various culverts along the WIS 64 corridor to improve drainage.
- Updating guardrail to meet current standards.
Schedule - Updated
Construction currently is scheduled for 2024.
Traffic Impacts
WIS 64 will be closed to through traffic during construction.
- The planned detour for non-traffic will utilize WIS 79, WIS 170 and County M.
- Local access will be maintained throughout the project for property owners, business owners and emergency vehicles.
Project Documents
Contacts
Jessica Doud
WisDOT Northwest Region Project Manager
(715) 577-2963
jessica.doud@dot.wi.gov
Tyler Rongstad
WisDOT Northwest Region Project Supervisor
(715) 461-0372
tyler.rongstad@dot.wi.gov
Christena T. O’Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov
Wisconsin Department of Transportation
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285
nwr.dtsd@dot.wi.gov