  • June 2011 - Completed preliminary engineering
  • Started creating draft map of proposed right of way, hold Statutory 84.295 hearings, adopt and record official map, incorporation of mapped right of way into long-range plans by local communities
  • March 2011 - Completed Environmental Assessment (EA) document

2010

  • Nov. 2010 - Met with local elected officials and conducted PIM to present preferred alternative and receive additional comments
  • July–Oct. 2010 - Completed preliminary design of preferred alternative. Continued environmental documentation, prepare draft Environmental Assessment (EA)
  • Jan.–June 2010 - Estimate preliminary impacts of alternatives; selected preferred alternative

2009

  • Nov. 10 and 12, 2009 - PIM

2008

  • Jan. 2008-Dec. 2009 - Met with land owners, local elected officials, agency representatives and general public. Refine alternatives details as appropriate

2007

  • Nov. 28/29, 2007 - PIM to present refined concepts
  • August 2007 - Met with local elected officials to present refined concepts
  • June–July 2007 - Refined access change concepts previously developed

2006

  • April 5 and 6, 2006 - PIM, presented the proposed long-term highway access plan for US 18/151 between Verona and Dodgeville