Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information
Project location
WIS 130 (WIS 133 to WIS 23), Lone Rock - Iowa County
Project overview
The purpose of this project on WIS 130 is to replace the deteriorated pavement surface, guardrail, and culvert pipes. The existing asphaltic pavement is cracking and deteriorating in condition. Treatment is needed to extend the pavement service life. Without improvement, the pavement will continue to deteriorate and adversely affect traveling conditions.
Improvements include:
- Pavement resurfacing
- Replace guardrail end terminals
- Replace culvert pipes that are in poor condition
Project location map
Culvert location map
Schedule
- March 2021 - Virtual Public Involvement Meeting (PIM)
- 2027 - Construction anticipated; advanceable to 2026 if funding is available.
Traffic impacts/detours
WIS 130 will be closed to through traffic and detoured during construction (view the detour route).
Access for residents, businesses, property owners, and emergency services will be maintained at all times during the project.
Status/phase
Design
Contact information
Josh Nelson
WisDOT Project Manager
(608) 246-3857
Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711