Location
US 10 from the Pepin/Buffalo County line in the town of Canton to County A in the town of Mondovi, all in Buffalo County.
Overview
This 5.16-segment of US 10 is showing signs of deterioration through cracking, rutting and patching. Many culverts also need cleaning and repairs. To extend the service life of the highway and maintain safety and acceptable drainage, the following improvements are proposed:
- Milling the pavement surface and overlaying with asphalt.
- Replacing guardrail and flattening slopes at guardrail end terminals.
- Cleaning, repairing or replacing culvert pipes, as well as cleaning ditches to remove sediment buildup and improve drainage.
Schedule
Construction currently is scheduled for 2028.
Traffic Impacts
The work will be completed using lane closures with flagging operations directing motorists through construction.
Contacts
John Bainter
WisDOT Southwest Region Project Manager
(608) 785-9729
john.bainter@dot.wi.gov
James Koenig
WisDOT Northwest Region Project Supervisor
(715) 838-8391
james.koenig@dot.wi.gov
Christena T. O’Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov
Wisconsin Department of Transportation
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285