WIS 35 (High Ridge Drive/Hanley Road interchange to Stageline Road), city of Hudson - St. Croix County

Location

WIS 35 south of I-94 between the High Ridge Drive/Hanley Road interchange and Stageline Road in the St. Croix County city of Hudson.

Overview

In recent years, the Wisconsin Department of Transportation has heard concerns from the public regarding the current traffic noise levels on WIS 35 near its intersection with High Ridge Drive and Hanley Road, prompting WisDOT to open an additional study of noise levels in this area to supplement a previous noise analysis completed for the installation of a noise wall on the west side of WIS 35.

To determine the future noise levels on the corridor, the Traffic Noise Model (TNM) from the Federal Highway Administration (FHWA) was used. The TNM was first calibrated to existing conditions after existing noise readings were taken in the field at the end of June 2023. Once the model was calibrated, future traffic volumes from 2037 were input via a traffic forecast developed by WisDOT, and an impact determination was made.

Because of that, the process continued, and noise abatement options were considered for impacted properties, and three noise walls have been proposed as the appropriate abatement measure:

  • One on the west side of WIS 35 south of the existing noise wall between the highway and Heritage Boulevard.
  • A second on the east side of WIS 35 southwest of Meadows Park and northwest of the Canary Way cul-de-sac.
  • And a third on the east side of WIS 35 between the highway and Meadowlark Drive and Meadowlark Lane.

Next Step

Two of the three proposed walls are being considered further in the design process as adjacent landowners and residents voted in support of them. The third wall may or may not go forward.

Schedule

Construction could occur at the earliest in 2025.

Traffic Impacts

If the walls are constructed, WIS 35 will remain open during construction, but motorists will encounter lane closures as the walls are anticipated to be built approximately 10 feet off the existing highway right of way and might require roadway shoulder reconstruction.

Project Documents

Voting on the proposed noise walls is now closed. For more information on the proposed project, please review the following:

Contacts

Daniel Rambo
WisDOT Northwest Region Project Manager
(715) 514-7255
daniel.rambo@dot.wi.gov

Jim Koenig
WisDOT Northwest Region Project Supervisor
(715) 838-8391
james.koenig@dot.wi.gov

Christena T. O'Brien
WisDOT Northwest Region Communications Manager
(715) 833-9814, (715) 828-9471
christena.obrien@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
(715) 836-2891, (800) 991-5285
WI Telecommunications Relay System (TTY): 711
nwr.dtsd@dot.wi.gov