Location
WIS 100 from Shepard Avenue to WIS 32, and the bridge along WIS 100 eastbound between Nicholson Road and Pennsylvania Avenue in Milwaukee County.
Overview
WIS 100 is experiencing pavement deterioration as expected with the roadway's age. Due to the present condition of this corridor, WisDOT is proposing to remove and replace the top two inches of asphalt pavement.
Additionally, the WIS 100 eastbound bridge between Nicholson Road and Pennsylvania Avenue over the Union Pacific Railroad is experiencing bridge deck deterioration. WisDOT is proposing to re-deck the current structure to provide an improved crossing over the railroad and extend the life of the structure. Construction of both projects is currently planned for 2024.
Resurfacing Project Improvements:
- 2-inch mill and overlay
- Nicholson Road intersection signal improvements
Bridge Rehabilitation Project Improvements:
- Bridge deck replacement
- Bridge girder painting
- Drainage improvements
- Guardrail replacement
- Bridge abutment repair
- Slope paving
Schedule
The bridge deck replacement and pavement resurfacing projects are anticipated to take place in 2024. The bridge deck replacement will likely begin first in early spring 2024 with the resurface occurring once the bridge is substantially complete. The construction of both projects is expected to be completed within the 2024 construction season.
Traffic Impacts
- Detour WIS 100 eastbound traffic during bridge construction beginning early spring 2024.
- Detour WIS 100 both eastbound and westbound traffic during the resurface following the substantial completion of the bridge construction in 2024.
-
Detour map
Status
Design phase -
Do you have any comments or questions? We'd like to hear from you! Please feel free to contact the project representatives below.
Contact Information
Nguyen Ly, PE., Design Project Manager -
Bridge Project
(262) 548-8739
Nguyen.Ly@dot.wi.gov
Robert Bellin, PE., Design Project Manager -
Resurfacing Project
(262) 521-4405
Robert.Bellin@dot.wi.gov