Project location
US 14 (WIS 80 to Bohmann Drive), City of Richland Center - Richland County
Project overview
This project will replace the existing pavement along US 14. The existing pavement has failed joints, mid-panel and corner breaks, spalling and potholes. Repair is needed to maximize the service life. The existing curb ramps do not meet ADA standards. Additional improvements include:
- Concrete joint repair and panel replacement where needed
- Curb and gutter and inlet repair where needed
- New monotube traffic signals will be installed at the US 14/ WIS 80 and US 14/ Sextonville Rd intersections
- New curb ramps will be installed to meet Americans with Disabilities Act (ADA) standards
Schedule
- March 23, 2023 - Public involvement meeting
5 - 6:30 p.m.
Richland Center Municipal Building
450 S Main Street, Richland Center
- 2028 - Construction anticipated but advance able to 2025 it funding is available
Traffic impacts/detours
Temporary crossovers are proposed for work east of the US 14/ WIS 80 intersection. Work west of the US 14/WIS 80 intersection will require a short term detour.
Status/phase
Design
Contact information
Jered Lex, P.E.
WisDOT Project Manager
(608) 785-9956
jered.lex@dot.wi.gov
Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Road
La Crosse, WI 54601
Phone: (608) 785-9022
Email:
swr.dtsd@dot.wi.gov