Project location
US 18 retaining wall, Helenville - Jefferson County
Project overview
The retaining wall on US 18 is tipping toward the sidewalk and is in need of repair. The work on this project includes removing the coping from the retaining wall that spans the entire length of the wall. Excavation behind the wall will occur in locations where the wall panels are tipping toward the sidewalk. The select wall panels are going to be removed and re-set so they are in line with the rest of the wall. The area behind the wall will then be backfilled and the new coping will be cast in place along the entire length of the wall. The railing will be removed as well and re-set in its existing location.
Schedule
- November 14, 2023 - Public Involvement Meeting
5:30 - 6:30 p.m.
Helenville Fire Department
N4737 Helenville Road, Helenville
- Fall 2024 - Construction anticipated
Traffic impacts/detours
US 18 will remain open to traffic under flagging operations and eastbound lane closure. Sidewalks remain closed.
Status/phase
Design
Contact information
Craig Hardy, P.E.
WisDOT Project Manager
(608) 246-5406
craig.hardy@dot.wi.gov
Hannah Punzel
WisDOT Southwest Region Communications Manager
(608) 246-7907
hannah.punzel@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
TTY: 711
Email:
swr.dtsd@dot.wi.gov