Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information
Project location
WIS 23 (County GG to Elder Ridge Road), Spring Green to Reedsburg - Sauk County
Project overview
WisDOT is proposing to improve approximately 5.24 miles of WIS 23 from the intersection of County GG to the intersection of Elder Ridge Road. The existing pavement exhibits signs of deterioration in the form of rutting, raveling, fatigue cracking, longitudinal cracking, and transverse cracking.
Proposed Improvements include:
- Extending the service life of the asphaltic pavement
- Mill approximately 2" of the existing asphaltic surface
- Overlay with 4" of HMA pavement
- Replace curb & gutter
- Lining culvert pipes
- Replace guardrail and end terminals throughout the project
- New pavement markings and add centerline and shoulder rumble strips
Schedule
- September 2022 - Public Input
- Spring/Summer 2027 - Construction anticipated with the potential to advance to 2026
Traffic impacts/detours
Project will be constructed with single lane closures controlled by flaggers.
Status/phase
Design
Contact information
Mahesh Shrestha, P.E.
WisDOT Project Manager
(608) 245-2674
mahesh.shrestha@dot.wi.gov
Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email:
swr.dtsd@dot.wi.gov