WIS 60 (Kickapoo River Bridge to US 61) - Crawford County

Project location | Project overview | Schedule | Traffic impacts/detours | Status/phase | Contact information

Project location

WIS 60 (Kickapoo River Bridge to US 61), Bridgeport - Crawford County

Project overview

The Wisconsin Department of Transportation (WisDOT) plans to resurface this 8.33-mile stretch of WIS 60. This project is needed to treat existing pavement distresses and is part of WisDOT's Highway Safety Improvement Program. The intent of this project is to extend the pavement's service life and decrease the potential for crossing centerline and roadway departure crashes along this corridor.

Additional improvements include:

  • Milling and removing 2 ½ inches of existing asphalt pavement.
  • Increasing shoulder width to 6 feet (5 feet paved, 1 foot aggregate.) This work will not extend beyond the existing gravel shoulder except as specified below.
  • Adding centerline and shoulder rumble strips.
  • Potential upgrades to existing guardrail and cross culverts. Work (if performed) in these areas may extend beyond the existing roadway width, but will not exceed the existing right-of-way.
  • Paving 3 inches of new asphalt pavement.

Additional information:

Schedule

Traffic impacts/detours

Road will remain open under flagging operations.

Status/phase

Design

Contact information

Paul Valenti, P.E.
WisDOT Project Manager
(608) 785-9053
paul.valenti@dot.wi.gov

Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, La Crosse Office
3550 Mormon Coulee Road
La Crosse, WI 54601
Phone: (608) 785-9022
Fax: (608) 785-9969
TTY: 711
Email: swr.dtsd@dot.wi.gov