Project location
WIS 81 (WIS 23 to Wildcat Rd), Darlington - Lafayette County
Project overview
The Wisconsin Department of Transportation (WisDOT) is developing plans to improve a 1.2 mile section of WIS 81 between WIS 23 and Wildcat Rd. The current pavement is deteriorating and has extensive cracking and rutting.
Proposed improvements:
- Pavement resurfacing
- Improve curb ramps along WIS 81 in the city of Darlington to meet Americans with Disabilities Act (ADA) standards to the maximum extent possible at the following intersections:
- Wells Street, Keep Street, Ohio Street, Division Street, Clay Street, East Street, and Arthur Street
- Install centerline rumble strips in the rural portion of the project
- Replace the existing guardrail and end terminals with Energy Absorbing Terminals to provide safer conditions for motorists
Public involvement
June 2020 - Virtual Public Involvement Meeting (PIM)
Schedule
- Summer 2026 - Construction anticipated
Traffic impacts/detours
WIS 81 will be open to two-way traffic.
- Shoulder closures will be needed for pedestrian curb ramp and guardrail improvements.
Pavement resurfacing operations will utilize one lane of traffic in each direction with flaggers.
- Motorists can expect to encounter flagging operations as follows:
- Urban portion: One city block at a time
- Rural portion: Between Arthur Street and Wildcat Road.
Status/phase
Design
Contact information
Mahesh Shrestha, P.E.
WisDOT Project Manager
(608) 245-2674
mahesh.shrestha@dot.wi.gov
Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email:
swr.dtsd@dot.wi.gov