US 10 Passing Lanes

The Wisconsin Department of Transportation (WisDOT) is in the process of developing plans for proposed improvements on four miles of US 10 in Manitowoc County. The purpose of this website is to provide information regarding the proposed improvements, describe the potential impacts it would have on the community and offer an opportunity for public comment.

Project location

The project is located on US 10 between the villages of Reedsville and Whitelaw. The project is located in the municipalities of Maple Grove, Rockland, Franklin, and Cato in Manitowoc County.


Project purpose and need

US 10 is an important east-west route serving local commuters as well as regional and interstate traffic. US 10 is also a high-volume truck route with approximately 22% of the daily traffic on US 10 consisting of trucks. US 10 is a two-lane roadway and because of the high truck volumes, there are limited opportunities for passing along this section of US 10.

US 10 is a state designated route for consideration of passing lanes through WisDOT’s statewide corridor planning initiatives because of the truck volumes and roadway alignment.

Anticipated benefits

The proposed project will improve safety and traffic operational conditions during passing movements.

Proposed improvements

This is a construction project to improve passing opportunities between Reedsville and Whitelaw. Proposed improvements include:

  • Construction of two miles of an eastbound passing lane between Manitowoc Street/Pleasant View Road and County G.
  • Construction of two miles of a westbound passing lane between County G and Fritsch Lane.
  • Reconstruction of short sections of Rocky Ledge Lane, Menchalville Road, and Fritsch Lane to match the new passing lanes.
  • Installation of new signing and pavement marking in the passing lanes.

Traffic impacts

  • Construction is currently scheduled for 2024.
    • Work is anticipated to occur between May and October.
  • US 10 will remain open to traffic during construction.
  • Motorists can expect to encounter lane shifts and flagging operations.
  • WisDOT will contact homeowners and businesses when working directly in front of the driveway to coordinate daily access.

Schedule

Initial design and planning for pavement and passing lane improvements were completed between 2013 and 2018. WisDOT conducted pavement improvements in 2018. Passing lane plans were shelved until funding was available to complete construction.

Current Design Phase (2022 – 2024)

  • Design updates - Fall 2022 to Summer 2023
  • Real estate acquisition - Fall 2022 to Summer 2022
  • Local official meeting - January 2023
  • Public involvement meeting - February 2023
  • Environmental document update - March 2023
  • Final plans for passing lanes - August 2023
  • Construction Current - 2024

Real estate

All permanent right of way was previously acquired to accommodate the passing lanes in 2017. Temporary easements will be required at spot locations for blending slopes and matching driveways. WisDOT Real Estate Section representatives contacted affected property owners in fall 2022 and acquisition of the necessary easements will be completed in 2023.

Business Resource: WisDOT’s In This Together program

WisDOT recognizes businesses located in work zones or impacted by detour routes have special needs. WisDOT's In This Together program is offered to businesses, organizations, and community leaders as an idea source as they plan for road construction in their area. It includes promotional examples, case studies, and a specially-designed Business Coordination Guide with information on:

  • Planning ahead
  • Staying informed
  • Keeping customers informed
  • Tips for businesses

WisDOT’s In This Together website is located at www.wisconsindot.gov/Together

Public input/comments

Your comments assist us in developing a project that will serve the needs of the traveling public as well as the needs of the local community. Please submit comments to WisDOT using one of the following methods so that we receive them by the comment date to be considered during design.

Project contact

Brian Haen, PE
WisDOT Project Manager
Wisconsin Department of Transportation
944 Vanderperren Way
Green Bay, WI 54304
Phone: (920) 366-4788
Email: Brian.Haen@dot.wi.gov

​​