Project location
US 12 between the north Sauk County line and WIS 13 in the town of Delton and city of Wisconsin Dells
Project overview
The project is designed to improve safety and pavement conditions along the corridor. Designed improvements include:
- Widen the paved shoulders to 5-feet between the county line and County A
- Replace the existing pavement and subgrade
- Install centerline and shoulder rumble strips between the county line and County A
- Upgrade the curb ramp at the US 12/Pioneer Drive intersection
Schedule
- March 2023 - Public Involvement Meeting
- June 2021 - Virtual Public Involvement
- 2026 - Construction scheduled
Traffic impacts/detours
US 12 is expected to be detoured to through traffic during construction. Access to local property and businesses will remain open. Temporary Limited Easements (TLE) may be needed during construction.
Status/phase
Design
Contact information
Gregory Brecka, P.E.
WisDOT Project Manager
(608) 245-2671
gregory.brecka@dot.wi.gov
Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email:
swr.dtsd@dot.wi.gov