Project location
WIS 19 (Division Street to River Road) - Dane County
Project overview
The Wisconsin Department of Transportation (WisDOT) is developing preliminary plans for a resurfacing project on WIS 19. The 3.6-mile-long project is located in the Town of Westport and Village of Waunakee, from the Division Street intersection to River Road intersection. Exception to the project length at the WIS 113/County I roundabout, constructed in 2018.
Proposed improvements:
- Resurface existing pavement (mill and overlay)
- Construct offset left-turn lanes and traffic signal upgrades at the WIS 19 and Schumacher Road/Raemisch Road intersection
- Update curb ramps as needed to meet American with Disabilities (ADA) requirements
- Culvert pipe replacements
- Paint railing on WIS 19 bridge over Sixmile Creek
Schedule
- May 3, 2022 - Public Involvement Meeting
- April 2022 - Public Involvement Meeting
- 2026 - Construction anticipated
Traffic impacts/detours
Flagging operations during construction
Status/phase
Design
Contact information
Kevin Drunasky, P.E.
WisDOT Project Development Supervisor
(608) 246-3811
kevin.drunasky@dot.wi.gov
Hannah Punzel
WisDOT Southwest Region Communications Manager
(608) 246-7907
hannah.punzel@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Email:
swr.dtsd@dot.wi.gov