Overview
This section between Stoughton and McFarland is divided into three stages.
US 51 from Roby Road to County B/AB in the city of Stoughton and towns of Rutland and Dunn. Improvements include:
- Expand the existing 2-lane rural section between Roby Road and County B (east) to a 4-lane urban section
- Provide a 10-foot wide sidewalk on both sides of US 51
- Construct a roundabout at the Rutland-Dunn Townline Road intersection (chosen as preferred alternative after November 2021 Public Involvement Meeting)
- Construct a pedestrian underpass north of the Rutland-Dunn Townline Road intersection
- Construct a roundabout at the County B (east) intersection
- Reconstruct the existing 2-lane rural section from County B (east) to County B/AB with a 2-lane rural section, a continuous median, and intersection improvements at each side road
- Pave shoulders to accommodate bicycles
US 51 from County B/AB to Exchange Street in the town of Dunn. Improvements include:
- Reconstruct the existing 2-lane rural section of US 51 with intersection improvements
- Construct a roundabout at the Mahoney Road intersection (chosen as preferred alternative after September 2022 Public Involvement Meeting)
- Pave shoulders to accommodate bicycles
US 51 from Tower Road to Exchange Street in the town of Dunn
- Convert the existing stop controlled intersection to a dual-lane roundabout
- Seeking input on the intersection control at Exchange Street and Tower Road
Public Involvement
Roby Road to County B/AB
County B/AB to Exchange Street
- September 2022 - Public Involvement Meeting
-
Handout
-
Presentation
- Roll plots and exhibits
- County B/AB to Tower Road
-
Roll plot
- Mahoney Road Intersection control evaluation alternatives
- Tower Road to Exchange Street
Schedule
Note: These dates are subject to change based on funding availability.
Roby Road to County B/AB
- Construction scheduled for 2026 and 2027
County B/AB to Exchange Street
- Construction scheduled for 2027
Tower Road to Exchange Street
- Construction scheduled for 2026
US 51 and County B/AB intersection (wisconsindot.gov)
- Construction scheduled for summer 2024