Stoughton (Spring Road to Roby Road)

Project overview | Public Involvement | Schedule | Exhibits | Contact information

Overview

This section between Stoughton and McFarland is divided between three stages.

US 51 from Spring Road to Fifth Street in the city of Stoughton and town of Dunkirk. Improvements include:

  • Reconstruct the existing 2-lane urban section and provide improved pedestrian accommodations
  • Provide a bicycle lane in both directions on US 51

US 51 from Fifth Street to Harrison Street in the city of Stoughton. Improvements include:

  • Reconstruct the existing 2 and 4-lane urban sections
  • Provide improved pedestrian accommodations
  • Update pavement markings at the Fourth Street intersection to provide a dedicated northbound left-turn lane
  • Provide bike routes on numerous parallel streets

US 51 from Harrison Street to Roby Road in the city of Stoughton and the town of Rutland. Improvements include:

  • Reconstruct the existing 4-lane urban section between Harrison Street and Hoel Avenue
  • Expand the existing 2-lane rural section between Jackson Street and Roby Road to a 4-lane urban section
  • Provide a 10-foot wide sidewalk on both sides of US 51 between Jackson Street and Roby Road

Public Involvement

Fifth Street to Roby Road

Spring Road to Fifth Street

Schedule

Note: These dates are subject to change based on funding availability.

Spring Road to Fifth Street

  • Construction scheduled for 2025

Fifth Street to Harrison Street

  • Construction scheduled for 2029, but advanceable to 2027

Harrison Street to Roby Road

  • Construction scheduled for 2026

Exhibits

Contact information

David Schmidt, P.E.
WisDOT Project Manager
(608) 246-3867
david2.schmidt@dot.wi.gov