Basis of payment
The basis of payment worksheet should be completed for an original contract and amendments in which the contract's costs have been modified.
Boilerplates
Construction engineering
Design and related services
Master contracts
Specialty
Municipal contract
Cover/signature pages
Amendment
Construction engineering
Design and related services
Master contracts
Specialty
Municipal contract
Special provisions
Special provisions change the standard provisions/boilerplate to match the scope of the current contract.
The following special provisions are often used on construction and design/related services contracts. WisDOT staff will work with the consultant to determine which special provisions are applicable.
-
Construction engineering - specific rate (December 10, 2020)
- General special provisions
(November 30, 2021)
- Three party design engineering (January 3, 2017)
-
Two party design engineering (March 10, 2022)
- Real Estate - Access (August 18, 2015)
- Real Estate - Acquisition (August 18, 2015)
- Real Estate - Appraisal (March 10, 2022)
- Real Estate - Project Management (August 18, 2015)
- Real Estate - READS (August 18, 2015)
- Real Estate - Relocation (November 29, 2021)
Personal computer (PC) specifications are required special provisions. Contact David Castleberg at (608) 264-7606 for more information.
- Construction PC specifications (for all
construction staff) – Minimum field office computer and mobile
device specifications for construction contracts where consultant supplies the project
engineer. Go to the AASHTOWare Project Knowledge Base web site, https://awpkb.dot.wi.gov/Content/Default.htm, for information about supported operating
systems and web browsers, how to obtain system access, and how to use
AASHTOWare Project Construction and AASHTOWare Mobile Inspector to administer a
construction contract. Field offices must provide a reliable Internet
connection as defined in Standard Specification 642.2.2 Field
Office. (December 14, 2022)
- Design PC specifications (for design staff working on an
engineer's estimate) - - Contracts with projects that have PS&E dates
of February 1, 2019, and beyond, go to the AASHTOWare Project Knowledge
Base web site, https://awpkb.dot.wi.gov/Content/Default.htm,
for information about supported operating systems and web browsers, how to
obtain system access, and how to use AASHTOWare Project Preconstruction
and AASHTOWare Project Estimator to create an engineer’s estimate.
(November 30, 2021)
Other contract information